I thought it would be fun to keep a list of all the things we’ve done in the house as we go:
1. 2/12/2011 – New toilet seat and lid in the guest bathroom
2. 2/12/2001 – Installed back door
3. 2/15/2011 – Installed wire nuts on all exposed wires
4. 2/17/2011 – Moving company delivered all our household goods.
5. 2/18/2011 – We officially begin staying in the house 😮
6. 2/22/2011 – Chimney cleaned and inspected.
7. 2/25/2011 – Internet connection installed.
8. 2/28/2011 – Installed guest bathroom door.
9. 3/3/2011 – Repaired leak in water supply line.
10. 3/5/2011 – First time to do yard work.
11. 3/8/2011 – Collected popcorn ceiling samples for asbestos testing.
12. 3/10/2011 – Ceiling samples test negative for asbestos 😮
13. 3/12/2011 – Jim removed popcorn texture from master bedroom ceiling.
14. 3/18/2011 – The new A/C systems are installed.
15. 3/19/2011 – The master hallway/closet wall is demo’d.
16. 3/23/2011 – Jim removed popcorn ceiling texture from master suite hallway.
17. 3/24/2011 – Jim removed popcorn ceiling texture from the master closet.
18. 3/29/2011 – Jim removed popcorn ceiling texture from the hallway to the master suite and in the bathroon vanity area – that’s the last of it in the master bedroom area!!
19. 4/9/2011 – Jim hooked our irrigation system up to the City’s reclaimed water supply.
20. 4/14/2011 – We ran our irrigation system for the first time with all the repairs Jim made, plus using reclaimed water.
21/ 5/5/2011 – Jim finished repairs for insurance items. (It was all for naught – they cancelled us anyway! Well, at least this stuff is done.) He removed exposed wires, installed exterior light fixtures, replaced siding planks and panels, and repaired window sills.